# construction.day-rate-quote The price of a small job the way trades quote it: so many days at a day rate, materials at cost plus a markup, and VAT on top. - **Labour** is days x day rate, rounded half up to the penny once. Days are hundredths of a day (`250` is 2.5 days, `50` a half day), so no float ever touches the money. - **Materials** are the cost plus a markup, priced by `finance.markup-price` on the `markup` basis (profit over cost: 15% on 100.00 is 115.00), rounded half up. The markup applies to materials only; the day rate is already the price of labour. For a margin target instead, price the materials with `finance.markup-price` yourself. - **VAT** is `finance.tax.add-vat` on the net total, GB rates, at the rate in force on `onDate`. Pass `null` when you are not VAT registered. Under the domestic reverse charge (see `construction.vat-reverse-charge`) quote with `null` too and say on the quote that the customer accounts for the VAT. Edges: zero days (a materials-only quote) and zero materials are fine. Negative days, rates or materials are errors, as is a markup below -100% and mixed currencies. day rate x hundredths must stay within 2^53 - 1.