# health.waiting-time How long a patient has waited on an NHS England consultant-led referral-to-treatment (RTT) pathway, the way NHS England counts it: days from the clock start to the clock stop (or to the measuring date while the patient is still waiting), the weekly reporting band, and whether the 18-week standard has been breached. Patients in England have the right to start consultant-led non-emergency treatment within a maximum of 18 weeks from referral. 18 weeks is 126 days, and a patient who has waited exactly 126 days is still within it (they are reported in the 17-18 week band); 127 days is a breach. `eighteenWeekDate` is the clock start plus 126 days, the last day on which treatment still meets the standard. **Week bands.** RTT returns put each pathway in a weekly time band, ">n-1 to n weeks", and `weekBand` is that n. The first band, 0-1 weeks, holds eight days (0 to 7), every later band seven: 8-14 days is band 2, 120-126 days band 18, 127 days band 19. NHS England's last band is "104+ weeks", 729 days and more; `weekBand` keeps counting above 104 (729 days is 105) so a caller can still tell long waits apart, and a return should put anything above 104 in the >104 band. `completedWeeks` is simply whole weeks (days divided by 7, rounded down), for display. A clock that starts and stops on the same day is a real pathway of zero days. **No clock pauses.** Earlier versions of the rules allowed "patient-initiated clock pauses". NHS England removed them in 2015 with the admitted pathway standard: "there is no longer any provision to report pauses or suspensions in RTT waiting time clocks ... under any circumstances". This capability therefore takes a clock start and an optional clock stop and nothing else, deliberately. Events that the rules do recognise are the caller's to apply: - a clock stop (rules 4 and 5: first definitive treatment, a decision not to treat, active monitoring, a patient declining treatment, and so on) is the `clockStop` date; - a DNA of the first appointment nullifies the clock (rule 5e, footnote 10), and when the patient rebooks a new clock starts (rule 3e), so pass the rebooking date as a new `clockStart`; - other new clock starts (rule 3: a second bilateral procedure, a new treatment, the end of active monitoring) are likewise new pathways. **Errors.** A measuring date before the clock start, a clock stop before the clock start, and a clock stop after the measuring date (a stop that has not happened yet) are errors. Dates are ISO `YYYY-MM-DD`, and the measuring date is always an argument, never the clock. ## Source NHS England, "Recording and reporting referral to treatment (RTT) waiting times for consultant-led elective care", version 5.2, February 2025: section 2.2 reproduces the "Referral to treatment consultant-led waiting times rules suite" (clock starts, rules 1-3; clock stops, rules 4-5), the introduction records the removal of clock pauses, and section 10.1.7 "Measuring the length of RTT pathways" defines the time bands. https://www.england.nhs.uk/statistics/wp-content/uploads/sites/2/2025/10/Recording-and-reporting-RTT-waiting-times-guidance-v5.2-Feb25.pdf